ABOUT US
Premium Energy Holdings, LLC. (Premium Energy), was created in 2010. It´s a developer of large energy storage resources specialized in pumped storage systems. In affiliation with PTEI, Premium Energy has worked on projects for the west and east coast along the U.S. This alliance has allowed our customers to deploy their own- and third-party Pumped Storage Project (PSP) and Battery Energy Storage Systems (BESS) projects  development, including feasibility studies, permitting, design, and construction.
PEH/PTEI ENERGY STORAGE PROJECTS
Many of our customer's large pump storage resources drew the attention of the Department of Energy, expressing their interest in financing up to 80% of the project cost. Each of these projects have an approximate cost estimate of about $3B. Some of our Premium PSP and BESS projects include:
U.S. west coast projects
FLOW BATTERY ENERGY STORAGE SYSTEMS (BESS)
  • MOJAVE A1 2,000MW/12HR
  • MOJAVE A2 500MW/12HR
  • NEENACH 2,000MW/12HR
  • SCATTERGOOD 100MW/12HR
  • HARBOR STATION 60MW/12
  • HAYNES 200MW/12HR
  • DCPP 280MW/12HR
PUMPED STORAGE PROJECTS (PSP)
U.S. EAST COAST PROJECTS
FLOW BATTERY ENERGY STORAGE SYSTEMS (BESS)
  • SHOREHAM PLANT 175MW/12HR
  • TIANA SUBSTATION 10MW/12HR
  • SOUTHHOLD SUBSTATION 5MW/12HR
PUMPED STORAGE PROJECTS (PSP)
logo_pehllce_02.png

WALNUT HEADQUARTERS

355 S. Lemon Ave, Suite A
Walnut, CA 91789
Phone: (909) 598-0890

Follow Us

Copyright 2020 © Premium Energy Holding. All Rights Reserved.

Search